tolling.info/Toll roads by state/Washington/SR 520 Gov. Albert D. Rosellini (Evergreen Point) Bridge
SR 520 Gov. Albert D. Rosellini (Evergreen Point) Bridge
The SR 520 Gov. Albert D. Rosellini (Evergreen Point) Bridge is a toll bridge in Washington, operated by Washington State Department of Transportation. It runs 2.92 miles. Tolls are collected all-electronic (cashless).
Opened 2011. Transponder required. Public operator.
- Type
- Toll bridge
- State
- Washington (WA)
- Length
- 2.92 miles
- Operator
- Washington State Department of Transportation
- How it charges
- All-electronic (cashless) ORTETCAET
- Location
- 47.64472, -122.28413
01
Which transponders work here
What this facility is recorded as reading, and what it is not. A tag absent from this list is not confirmed to work here.
Accepts Good To Go!
02
Who runs it
The agency that tolls this facility, and where to reach it.
03
Elsewhere in Washington
Other tolled facilities in the same state, all of them listed on the Washington page.